Monday, 21 November 2011

Panels Panels Everywhere.....Cont......

Saturday 12th November
Since the last update the car has progressed along, the floor has been fully marked up and drilled with a layer of vinyl applied to the interior facing side. The floor has been riveted to the chassis around 3 sides of the floor (the 4th side will include the side panels) and the chassis turned the right way up.

Vinyled Floor
Riveting Stuff



















Monday 21st November
Today my plan was to attack the seat back panel and continue with the fitting of the side panels.

The seat back panel required some fettling before I was happy with its fitment, unfortunately due to the tight fit I have managed to chip the powder coating on the chassis, nothing that can't be fixed though. The seat back panel is currently held in place by a few temporary fixings, the final fit will be much later in the build.

For the side panels I had to remove a section of material as the side panels fit both the aero-screen and classic striker, once the access material was removed attached the side panels (using the previously drilled underside fixings and a couple of clamps and set to work bending over the top of the panel over the chassis, temporarily securing with a couple of self tapping screws.

Seat pack panel, side panels and bulkhead base in place

The final job of the day was trimming and the bulkhead base panel and clamping in place along with a section of angle for the scuttle upright, I will mark up and drill these at a later date.

2 comments:

  1. Looking good........am so impressed.

    Do the pipes come ready made, or do you have to flare them yourself

    ReplyDelete
  2. The pipes were cut to lenght and the ends flared

    ReplyDelete