Sunday 13th May
With the rear diff and driveshafts in place
I have taken the opportunity to attached the rear discs, callipers and flexi
hoses, I don’t see any need to remove any of this in the future so the brake
pipes have been fully connected and tightened, overall I am pretty pleased with
how this all looks.
Saturday 19th May
I have done a fair amount of work tidying
up the wiring loom, with the loom in the tunnel now fully secured in place,
once the loom exits the tunnel it runs along the chassis behind the seat back
panel and then along the nearside to the rear of the car.Speedo Sensor Bracket |
As the steering column is in place I needed to mark off and drill a hole where the column passes through the bulkhead, while not a difficult task it is one that is very easy to get wrong resulting in a new panel, thankfully this went with any problems.
Sunday 17th June
I managed to get a couple of hours working on the, I had a couple of things I wanted to attack today, 1st up was wiring in the fuel pump, I have only completed half this task as I need to decide where to mount the earth, the next task was the handbrake.
I have mounted the handbrake and started connecting up the cables, I will adjust to get the required tension once the car is on the ground
Its coming along great..................at this rate you ll need another holiday