Saturday, 25 January 2014

Long Time No Update.....

Saturday 5th October

I only managed a short time on the car, I marked up the position for where to pass the lambda sensor wiring through the body work, removed the exhaust manifold and drilled the hole and fitted an appropriate grommet, I need to cut the current connector off the sensor wiring and re-wire it once I have passed the wiring though the grommet, slight annoying but it will look tidy.

Sunday 13th October

I have started marking up the dashboard layout, ready for fitting the gauges, warning lights and switches, this will allow me to crack on with the wiring behind the dashboard, tidying up all the wires as a I go.

Saturday 26th October

With the dash all marked out I thought I would drill the holes for the clocks, 3 out of 5 done, as I have no 80mm hole saw for the tacho and speedo....time to add to my tool collection.

Saturday 23rd November
Alternator Set-up

Today I managed to drill the two holes for the 80mm clocks in the dash, once I get back from my holiday I will start wiring the dash……..….Two weeks in Florida. J

Since the last update I have managed to fit the alternator and complete the fitting of the brackets, (with thanks to various other blogs on the net)

Wiring in the warm.
Friday 27th December

Rather than spend the evening out in the cold garage, I bought the car into the warm lounge, wiring the dash is the task in hand.

Saturday 18th January

This wiring lark is very time consuming, what started as a loom in the form of cooked spaghetti now appears to be a loom in the form of cooked spaghetti with some connectors on the end, a little more work is required I think, on the plus side most of the switches are wired so I can start wrapping the wires in loom tape. I have also fitted the front brake callipers and plumbed in the brake pipes which are all secure.